Research Papers by R. Scheumann

1 - 1 of 1 result

This study describes the experience received in operating an SM-SBR under different hydraulic retention times for the treatment of synthetic greywater. The pilot scale SM-SBR with a working volume of VR = 500 L is operated with hydraulic retention times of 33, 24 and 12 h, and a volumetric exchange
Desalination 248 (2009)