Process
1 - 4 of 4 results
|
In the last years, boron and arsenic are gaining wide attention in the water treatment community due to their adverse effects both on human/animal health and on agriculture. As a consequence, nowadays, the number of water treatment plants equipped with boron and arsenic removal facilities is growing
Desalination 223 (2008)
|
|
Energy consumptions and costs of desalting systems are among the main parameters affecting the choice of certain desalting system and desalted water final cost. The paper describes a semi-empirical method for determining production and investment costs taking into account plant capacity, availabilit
Desalination 223 (2008)
|
|
A combined system has been devised with a liquid–liquid extraction–re-extraction reactor where the extraction compartment and the re-extraction compartment are put in contact with one another through the organic phase composed of an extractant and a diluent. We have applied this process to a system
Desalination 167 (2004)
|
|
a process flow sheet and a plan view are given. A preliminary study on further R&D actions and possible measures to enhance plant economy are also discussed.
Desalination 168 (2004)
|